SMP win Briggs Marine Contractors Limited contract
Briggs Marine approached SMP to supply a Dual Launch and recovery system, which is designed and manufactured by SMP's skilled workforce.
The Twin Basket Launch and Recovery System has been specifically designed to give a compact operating footprint to minimise the deck space required on board a vessel or barge. Emphasis has been placed on ease of mobilisation and demobilisation, so that these costs are kept to a minimum.
The Dual LARS is made up of various different components including Base Skid, A-Frame, Primary and Secondary Baskets, Hydraulic Power Packs and Winches. The Dual LARS is designed toLloyds Register Code for Lifting appliances in a Marine Enviroment and in compliance with IMCA D023 and IMCA D018 regulations as standard.
Craig English, Operations Director at Briggs Marine Contractors Limited said "Briggs chose SMP as we believe their LARS product reflects our own values in delivering a safe, reliable, high quality diving service for inshore & offshore clients."
Mark Peloe, Sales Executive at Submarine Manufacturing and Products Ltd said "SMP are delighted to have been chosen to supply Briggs Marine with a brand new Dual Basket LARS system, this further strengthens the existing relationship between the 2 companies. The specification of the SMP system, our reputation for building high quality and extremely durable equipment and the fact that we had a system in stock ready to ship ensured that we were chosen by Briggs Marine as the supplier."