This is a saturation and dive control room originally built in 1979 for Mc/Dermott International. This control room is compact and needs a full upgrade of the electrical systems. The container will require some remedial work. Also all the gas and air panels are in reasonable condition.
The panel layout is as follows:
5 x Separate lock panels for DDC control and life support
1 x Lock panel for a SPHL
1 x Bell and divers control panel
Incoming gas and analysis panel
Documents available: Old Certification
Pipework and Instrumentation Layout Drawing